Home |  About Us |  Contact


Renewable energy news, events & providers
in Australia and New Zealand.
Recent Listings
  • Vacy Solar Farm

    Rio Indygen is proposing to build a 25MW solar farm near Vacy in the New South Wales Hunter region.

    (24/06/2019 03:53PM)

  • Chichester (Pilbara) Solar Farm

    Alinta Energy is planning to construct a 60MW solar farm near the Christmas Creek iron ore mine in the Pilbara region of Western Australia.

    (24/06/2019 03:39PM)

  • Quorn Park Solar Farm

    Renewable Energy Developments Pty Ltd is proposing to build a 160MW solar farm near Parkes in the central west of New South Wales.

    (24/06/2019 02:55PM)

  • MacAnzac Project

    AgriWaste Pty Ltd is proposing to develop a 100MW agricultural waste energy generating plant near Coleambally in the New South Wales Riverina.

    (24/06/2019 02:40PM)

  • Woodvale Solar Farm

    GBM Gold plans to construct a 60MW solar farm on disused evaporation ponds at Woodvale near Bendigo.

    (27/05/2019 02:32PM)

Innamincka Geothermal Power Plant

Geodynamics Limited is developing the world’s first multi-well hot fractured rock power project. Geodynamics has assessed its resource as holding geothermal energy sufficient to support several thousand megawatts of electricity generating capacity.

The company planned to develop a1 MW advanced pilot plant. After which a decision on whether to proceed with a 25 MW project to demonstrate the potential of hot-rock geothermal energy for zero-emission, base-load power is to made by 2013. A 500 MW power plant is planned by the end of the decade with the long term goal of producing several thousand megawatts.

September 2013, the company reported that the results from the Habanero pilot plant supported its belief that the its enhanced geothermal system could play a material role in Australia’s energy future but the Cooper Basin resource will require “significant capital investment” for further exploration, development and to extend transmission infrastructure" and that "Under the current market conditions, this scale of expenditure is not economic".

Geodynamics was developing plans, and seeking a power purchase agreement, for an initial smaller scale commercial project of 5 - 10 MW to supply companies who are looking to exploit shale gas and shale oil developments in the region. This would require six wells to be operating.

In August 2016, Geodynamics announced that it was closing down the project. The company said that it had managed to extract super-heated water from five kilometres below the earth's surface and use it to generate small amounts of electricity. But the cost of implementing the technology and also the cost of delivering the electricity that was produced to a market was greater than the revenue stream that could be created.

Company: Geodynamics Limited

Capacity (MW): 10

Status: Cancelled

Start Year: 2014

Technology: Steam turbine

Fuel: Geothermal

Source of Information: Geodynamics web site (September 2011, September 2013)

Location

  • Innamincka, South Australia 5731