  • Vacy Solar Farm

    Rio Indygen is proposing to build a 25MW solar farm near Vacy in the New South Wales Hunter region.

    (24/06/2019 03:53PM)

  • Chichester (Pilbara) Solar Farm

    Alinta Energy is planning to construct a 60MW solar farm near the Christmas Creek iron ore mine in the Pilbara region of Western Australia.

    (24/06/2019 03:39PM)

  • Quorn Park Solar Farm

    Renewable Energy Developments Pty Ltd is proposing to build a 160MW solar farm near Parkes in the central west of New South Wales.

    (24/06/2019 02:55PM)

  • MacAnzac Project

    AgriWaste Pty Ltd is proposing to develop a 100MW agricultural waste energy generating plant near Coleambally in the New South Wales Riverina.

    (24/06/2019 02:40PM)

  • Woodvale Solar Farm

    GBM Gold plans to construct a 60MW solar farm on disused evaporation ponds at Woodvale near Bendigo.

    (27/05/2019 02:32PM)

Wivenhoe Dam Power Station

The Wivenhoe Power Station is situated between the Splityard Creek Dam and Lake Wivenhoe. The Splityard Creek dam is situated in hills adjacent to Lake Wivenhoe and is about 100 metres above it.

The Wivenhoe Dam has been built across the Brisbane River about 30 kilometres north of Ipswich,

During the pumping phase in the operating cycle the generator operates as an electric motor driving the pump to lift water from Lake Wivenhoe to the upper storage of Splityard Creek Dam. When peak demand for electricity occurs the flow of water is reversed, flowing from the upper to the lower storage and driving the turbine generator to generate electricity.

The Splityard Creek dam has sufficient capacity of 500 MW for 10 hours of continuous power generation. It takes about 14 hours of pumping to refill it.

Wivenhoe Dam Power Station was commissioned in 1984. It was transferred from Tarong Energy to CS Energy (both Queensland Government instrumentalities) in 2011.

A mini hydro-electric power station with an output of 4.5 MW, powered by water from the Wivenhoe Dam, into the Brisbane River commenced operation in 2003.

Company: CS Energy

Capacity (MW): 500

Status: Operating

Start Year: 1984

Technology: Hydro

Fuel: Hydro

Type of Turbine: 250MW

No. of Turbines: 2

Source of Information: Wikipedia and CS Energy web sites (September 2011)