Home |  About Us |  Contact


Renewable energy news, events & providers
in Australia and New Zealand.
Recent Listings
  • Alberton Wind Farm

    Synergy Wind is proposing to develop a wind farm with 34 turbines near Alberton in south-east Victoria.

    (13/10/2017 02:18PM)

  • Cultana Pumped Hydro Project

    EnergyAustralia with the Arup Group and Melbourne Energy Institute are conducting a feasibility study into a 225 MW pumped hydro plant using sea water on the Spencer Gulf near Port Augusta.

    (09/10/2017 04:20PM)

  • Beelbee Solar Farm

    The Western Downs Regional Council has approved development of the Beelbee Solar Farm by the APA Group. The solar farm near Dalby in Queensland, will have a capacity of up to 240 MW and the potential for up to 100 MW of battery storage.

    (04/10/2017 02:31PM)

  • Golden Plains Wind Farm

    WestWind Energy is proposing to construct a 235 turbine wind farm with a capacity of 800 MW near Rokewood, north-west of Geelong.

    (04/10/2017 01:45PM)

  • Whyalla Solar Farm

    Adani Infrastructure is proposing to construct a 140 MW solar farm north of Whyalla in South Australia.

    (04/10/2017 01:25PM)

Featured Businesses

Australian Energy Storage Conference
 
Renewable Cities Conference
 
Promote Your Renewables Business
 

 

Wivenhoe Dam Power Station

The Wivenhoe Power Station is situated between the Splityard Creek Dam and Lake Wivenhoe. The Splityard Creek dam is situated in hills adjacent to Lake Wivenhoe and is about 100 metres above it.

The Wivenhoe Dam has been built across the Brisbane River about 30 kilometres north of Ipswich,

During the pumping phase in the operating cycle the generator operates as an electric motor driving the pump to lift water from Lake Wivenhoe to the upper storage of Splityard Creek Dam. When peak demand for electricity occurs the flow of water is reversed, flowing from the upper to the lower storage and driving the turbine generator to generate electricity.

The Splityard Creek dam has sufficient capacity of 500 MW for 10 hours of continuous power generation. It takes about 14 hours of pumping to refill it.

Wivenhoe Dam Power Station was commissioned in 1984. It was transferred from Tarong Energy to CS Energy )both Queensland Government instrummentalities) in 2011.

A mini hydro-electric power station with an output of 4.5 MW, powered by water from the Wivenhoe Dam, into the Brisbane River commenced operation in 2003.

Company: CS Energy

Capacity (MW): 500

Status: Operating

Technology: Hydro

Fuel: Hydro

Type of Turbine: 250MW

No. of Turbines: 2

Source of Information: Wikipedia and CS Energy web sites (September 2011)

Location

  • Brisbane Walley Highway
    Fernvale, Queensland 4306
    Australia
View All

Images